Our fracture consulting services deliver significant production and economic benefits to operators in plays across the US and worldwide. Some highlights include:

Marcellus: 153% increase in gas production from a new well

BASINWORX analysis showed that wells completed with 10 stages were dramatically under‑stimulated and under‑producing as a result. Modeling identified an optimized completion design with 25 stages that significantly increased contact, improved conductivity and would increase peak gas production by 123% compared to the current 10 stage design. The actual well outperformed and achieved a 153% increase in 180 day gas production.
 
Project deliverables
  • Justified decreasing fracture stage spacing and increase the number of stages
  • Justified increasing proppant volume
  • Supported increasing PUD well recovery to 10 BCF/well

Eagle Ford: 33% increase in 30 day production, with no increase in well cost

Eagleford.png
A BASINWORX evaluation demonstrated that investing in a ceramic tail-in completion design with an optimized balance of contact and conductivity would increase 30 day production by 4,730 BOE compared to a sand-only completion.

An alternative ceramic tail-in design evaluation showed that it could achieve a 10% increase in production over the current sand-only completion with no increase in well cost.
 
Project deliverables
  • Assessed past performances of the wells
  • Optimized completion and frac designs to increase well productivity
  • Benchmarked different fracturing technologies

Bakken: $1.9M increase in NPV and faster pay out from new wells

BASINWORX Bakken
To reduce well cost, an operator changed from 20 stage ceramic completion to a 20 stage sand completion, however this resulted in a drastic reduction in oil production, lower ROI and a longer pay out. A new 30 stage sand completion design that focused on increasing the contact area only delivered marginal improvements in production and economic performance.

Our BASINWORX evaluation identified a high contact and conductivity 30 stage ceramic completion design that significantly increased production, achieved a higher NPV, increased ROI and delivered a faster return on investment.
 
Project deliverables
  • Assessed past performances of the wells
  • Provided optimized completion and frac designs to increase well productivity
  • Benchmarked different fracturing technologies

Vast experienced in plays across the US 